Skip to main content
REE Mechanical Inc. logo

HVAC Repair & Emergency Service

Commercial Temporary Cooling Rental & Setup in Southern California

Spot coolers and rental cooling equipment arranged to keep a store trading while parts are on back order.

What is temporary cooling rental and setup for a commercial site?

Temporary cooling rental and setup puts rental equipment in place to keep a commercial space cool while the permanent repair or replacement is pending. It ranges from a single spot cooler in a stockroom to larger units ducted into a sales floor.

REE Mechanical Inc. has teamed up with Herc Rentals to provide it. The rental is there to bridge a gap, so a store can keep trading at reduced comfort instead of closing while it waits on a part or a new unit.

When is temporary cooling worth arranging?

Arrange it when the space cannot go without cooling and the permanent fix is days or weeks away, because of a back-ordered part, a long equipment lead time, or a heat event the remaining units cannot handle.

  • A compressor, coil, or control board is on back order and the unit cannot run without it.
  • A replacement rooftop unit is on order but has not shipped.
  • A heat wave is pushing the surviving units past what they can hold.
  • A planned replacement or crane lift will leave part of the building without cooling for a stretch.
  • A critical room, such as a network closet, pharmacy area, or refrigerated stockroom, cannot be left warm while the main unit is down.

Across the inland valleys and the high desert, long summer heat makes a lead-time problem far more likely to become a closure.

How does REE Mechanical work with Herc Rentals?

You choose how involved we are. We can oversee the whole process, installation and removal included, or connect you with the Herc team member nearest your facility if you would rather contract it yourself.

Either way, the diagnosis drives the rental. What failed, which space is affected, and how long the parts are likely to take decide what equipment goes in and for how long. Vanny Weber, our Scheduling and Operations Lead, gets that first diagnostic call on the board and a technician moving.

What kinds of rental cooling equipment are used?

The choice depends on the size of the space and how long coverage is needed. Small rooms take a portable spot cooler; a sales floor usually needs larger equipment placed outside and ducted in.

EquipmentFitsPlanning point
Spot coolerStockroom, office, network closetWarm exhaust has to be ducted out of the space
Larger portable or trailer-mounted unitSales floor or large open areaPlacement outside and a duct path through a door or opening
Supplemental unitA space whose rooftop unit is struggling but runningSized to add capacity, not replace the unit

What has to be planned before the equipment arrives?

Power, condensate, placement, and removal should all be settled before delivery. A rental that arrives without those answers tends to sit on the dock while the space stays warm.

  • The cooling load of the affected area, so the equipment matches the space.
  • The power source: available building circuits or a separate generator.
  • Where condensate goes and, for spot coolers, how hot exhaust air leaves the room.
  • Placement and duct routing that keep exits, aisles, and fire equipment clear.
  • Delivery and setup timed around trading hours.
  • A removal date tied to the permanent repair.

How does the rental run alongside the repair?

Temporary cooling runs in parallel with the permanent fix. It goes in once the lead time is known and comes out when the repaired or replacement unit is running again.

  1. The technician diagnoses the failure and confirms the parts or equipment lead time.
  2. Jessica Bresciani, our Estimating Operations Lead, turns the findings into a quote for the permanent repair or replacement.
  3. The rental is scoped for load, power, condensate, placement, and duration.
  4. Equipment is delivered and set up, ideally outside trading hours.
  5. The permanent repair or replacement is completed once parts arrive.
  6. Rental equipment is removed and the work order is closed out.

Why do temporary cooling plans fall apart?

Temporary cooling plans fall apart when sourcing starts from zero during a regional heat event, when nobody scoped power or placement, or when nobody planned the removal date.

The first is the hardest to fix in the moment, because a heat event sends every facility manager in the region looking for the same equipment at once. An existing rental relationship is the planning answer. The last one is the most avoidable: without a removal date, rental charges keep running weeks after the permanent repair is done. Tracking the rental on the same work order as the failed unit lets your facilities desk see which sites are on temporary cooling and when each is due to come off.

What safety points apply to temporary cooling?

Temporary equipment must never block exits, aisles, or fire equipment, and its electrical load has to suit the circuit or generator feeding it. Generator use and fuel storage can carry local requirements.

Check with the local jurisdiction and your landlord before a generator goes on site. REE Mechanical Inc. is licensed, bonded and insured, and our technicians are factory-trained.

Where can we arrange temporary cooling rental and setup?

We arrange Herc Rentals temporary cooling for the commercial sites we service in our six Southern California counties. See all service areas, including Riverside County and San Diego County.

Line up coverage early

Call (800) 742-0910 as soon as a long lead time is confirmed. The earlier the rental is scoped, the more likely the right equipment is available.

Our article on temporary cooling when equipment is on back order covers the planning, and HVAC replacement covers what comes next.

Commercial Temporary Cooling Rental & Setup in Southern California is part of our HVAC Repair & Emergency Service service line.

Why REE

What you get when we take the call

  • Priority Response for Priority Accounts

    Work orders go in 24/7, and priority accounts get a technician on site within 4 hours once site documentation and roof access are in place (actual arrival varies with location and conditions).

  • Technicians Across Southern California and Arizona

    Technicians are based across Southern California and Arizona, so a visit does not start with a drive from one central yard.

  • EPA-Certified Technicians

    Every technician is EPA certified for refrigerant handling and works on all types and brands of commercial heating and cooling equipment.

  • We Work Inside Your Systems

    IVR and work-order compliance is standard practice here, so the reporting trail your department is measured on gets fed correctly.

How it runs

From work order to close-out

  1. 01

    Place the Work Order

    Call (800) 742-0910 or submit through your IVR or work-order system, 24/7. Our office staff sets urgency with you, not for you.

  2. 02

    Dispatch a Technician

    A technician is assigned and on the way. Priority accounts get a technician on site within 4 hours once site documentation and roof access are in place (actual arrival varies with location and conditions).

  3. 03

    Diagnose and Report

    We find the actual fault, document findings against the asset, and give you the options in plain language before work proceeds.

  4. 04

    Repair and Close Out

    The approved repair is completed, the site is left clean, and the work order is closed out in your system so the trail is complete.

Questions

About Commercial Temporary Cooling Rental & Setup in Southern California

Who supplies the rental equipment?

Herc Rentals. We can oversee installation and removal for you, or connect you with the Herc team member closest to your facility if you would rather contract it directly.

When should we ask for temporary cooling?

As soon as a long parts or equipment lead time is confirmed. Equipment gets scarce during regional heat events, so early scoping improves the odds that the right unit is available.

How do we keep rental charges from running long?

Set the removal date when the rental is scoped and tie it to the permanent repair. Tracking the rental on the same work order as the failed unit makes it easy to see when it should come off.

Request Temporary Cooling Rental & Setup in Southern California

Call REE Mechanical Inc. at (800) 742-0910 to arrange temporary cooling across Ventura, Los Angeles, Orange, San Bernardino, Riverside, and San Diego counties.

Service & dispatch
1-800-742-0910

Monday - Friday: 7:00 AM - 4:00 PM · 24/7 emergency dispatch